Simulation Run Information

This panel contains information regarding the customer for a WEPS simulation run. Information can be entered in the following fields:









There are three methods available for specifying the length of a WEPS simulation run (NRCS, Dates, Cycle). The user can select the specified "WEPS run length" method to use from the 'Run' tab of the 'Configuration' panel, which is accessible via the 'Configuration' menu. These methods require different user inputs. The pertinent input and display fields are visible at the bottom of the Simulation Run Information panel, depending upon the method specified in the configuration settings.

NRCS


Dates



Cycle