1 Number of years in WEPS management rotation file 1/ 1/ 1| Scraper, land plane, leveler | | 1/ 2/ 1| Subsoiler - V frame, curved shanks (36 inch spacing) | | 1/ 4/ 1| Scraper, land plane, leveler | | 1/ 5/ 1| Subsoiler - V frame, curved shanks (36 inch spacing) | | 1/ 7/ 1| Scraper, land plane, leveler | | 1/ 8/ 1| Subsoiler - V frame, curved shanks (36 inch spacing) | | 1/10/ 1| Scraper, land plane, leveler | | 1/11/ 1| Subsoiler - V frame, curved shanks (36 inch spacing) | |