******************************************************************** * * * * * USDA - WATER EROSION PREDICTION PROJECT * * * * HILLSLOPE PROFILE - WATERSHED * * EROSION MODEL * * * * CONTINUOUS SIMULATION AND * * SINGLE STORM OPTIONS * * * * * * VERSION 2004.700 * * * * September 7, 2004 * * * * * * * ******************************************************************** Do you wish to output [e]nglish or [m]etric units for the average annual summary output file? Enter [e] or [m] --> [m]etric default English units selected Do you wish to drop out of the model upon invalid input and write over identical output file names? (batch mode) Enter N to run watershed option (not a SHELL option). Enter Y or N --> [Y] Continuous or single event option --------------------------------- 1 - continuous simulation 2 - single storm Enter option (1 or 2) --> [1] Model version option -------------------- 1 - hillslope version (single hillslope only) 2 - hillslope/watershed version (multiple hillslopes, channels, and impoundments) 3 - watershed version (channels and impoundments) (option 2 or 3 must be previously selected) Enter option (1,2 or 3) --> [1] Do you want hillslope pass file output (Y/N)? [N] --> Soil loss output options for continuous simulation ---- ---- ------ ------- --- ---------- ---------- [1] - Abbreviated annual 2 - Detailed annual 3 - Abbreviated event by event 4 - Detailed event by event 5 - Monthly -------------------------------------------------- Enter Soil Loss output option [1] Do you want initial condition scenario output (Y/N)? [N] --> Enter file name for soil loss output --> file name read in: ..\Output\loss_1.txt Do you want water balance output (Y/N)? [N] --> Do you want crop output (Y/N)? [N] --> Do you want soil output (Y/N)? [N] --> Do you want distance and sediment loss output (Y/N)? [N] --> Enter file name for plotting output --> file name read in: ..\Output\plot_1.txt Do you want large graphics output (Y/N)? [N] --> Enter file name for large graphics output --> file name read in: ..\Output\grph_1.txt Do you want event by event output (Y/N)? [N] --> Do you want element output (Y/N)? [N] --> Do you want final summary output (Y/N)? [N] --> Do you want daily winter output (Y/N)? [N] --> Do you want plant yield output (Y/N)? [N] --> Enter name of file containing management data --> file name read in: p1.man Enter name of file containing slope data --> file name read in: p1.slp Enter name of file containing storm data --> file name read in: p1.cli Enter name of file containing soil data --> file name read in: p1.sol Please enter the irrigation option ---------------------------------- [0] no irrigation 1 sprinkler, fixed date 2 sprinkler, depletion level 3 sprinkler, combination 4 furrow, fixed date 5 furrow, depletion 6 furrow, combination ----------------------------------- Enter irrigation option [0] NO IRRIGATION SELECTED. Enter number of years to simulate --> To bypass erosion calculations for very small events, enter 1 Otherwise, to route all events enter 0 (Small events have runoff less than 10 mm and peak runoff less than 10 mm/hr) [0] --> SIMULATION YEAR = 1 OPERATION ON PLANE 1 ON DAY 121 2 may 1 routing runoff & erosion event on OFE 1 of hillslope 1 OPERATION ON PLANE 1 ON DAY 125 OPERATION ON PLANE 1 ON DAY 130 PLANTING CROP # 1 on OFE # 1 on DAY 130 22 may 1 routing runoff & erosion event on OFE 1 of hillslope 1 30 may 1 routing runoff & erosion event on OFE 1 of hillslope 1 OPERATION ON PLANE 1 ON DAY 156 17 jul 1 routing runoff & erosion event on OFE 1 of hillslope 1 20 jul 1 routing runoff & erosion event on OFE 1 of hillslope 1 4 aug 1 routing runoff & erosion event on OFE 1 of hillslope 1 28 aug 1 routing runoff & erosion event on OFE 1 of hillslope 1 21 sep 1 routing runoff & erosion event on OFE 1 of hillslope 1 11 oct 1 routing runoff & erosion event on OFE 1 of hillslope 1 12 oct 1 routing runoff & erosion event on OFE 1 of hillslope 1 ANNUAL CROP HARVEST DATE 288 -- plane 1 yield 0.974(kg/m**2) 18 oct 1 routing runoff & erosion event on OFE 1 of hillslope 1 25 oct 1 routing runoff & erosion event on OFE 1 of hillslope 1 OPERATION ON PLANE 1 ON DAY 305 Hillslope SUCCESSFUL simulation - returning to DOS WEPP COMPLETED HILLSLOPE SIMULATION SUCCESSFULLY Closed file