Process: Ridges and Dikes (P 05)
This process will simulate an operation's effect on oriented roughness of the surface. Its parameters are:
- Ridge Flag
- Tillage operations can:
- 0: Leave existing ridges alone
- 1: Create a specified ridged and/or diked surface, regardless of pre-existing surface conditions.
- 2: Create a specified ridged and/or diked surface based upon tillage depth.
- Ridge Height
- Ridge Height is measured from the top of the ridge to the bottom of the furrow.
- Ridge Spacing
- Ridge Spacing is measured parallell across the top of two adjacent ridges.
- Ridge Top Width
- Ridge Width is measured across the top of the ridge.
- Dike Height
- Dike Height is measured from the top of the dike to the bottom of the furrow.
- Dike Spacing
- Dike Spacing is measured from dike top to dike top down the furrow.